Fully booked until June 1, 2028. Ask us about similar campers.As of September 20, 2026.

Ford with electric roof tent

  • Minimum hire 14 days
  • Driver age 25+

Specifications

CategoryPropertySpecification
Sleeping & seatingBelted seats5
Sleeping places2
Child-seat anchors2
Bed 1Length210 cm
Width140 cm
Ground tent × 1On requestA separate ground tent can be requested. Tell us your party and we confirm the tent and any cost with your quote.
Driving & dimensionsVehicleFord · Ranger
Engine / fuel / transmissionDisplacement3200 cc
FuelDiesel
TransmissionAutomatic
DriveDrivetrain4WD
Drive modes4H (high range) / 4L (low range)
Fuel use13–14 L/100 km
Year2019
Power & connectionsFuel storage145 L
Water storageFresh: 115 L
Gas bottles4 kg
Solar panelFixed · 300 W peak
  • Auxiliary battery
  • 12 V supply
  • 240 V supply
  • Extension cord
  • Water hose
  • External water tap
Comfort & storageAwningTypeVehicle mounted
StylePull out
  • Air conditioning
  • Apple CarPlay
  • UHF radio
  • GPS navigation
  • Living area lighting
KitchenStoveTypePortable
FuelGas
Burners2
FridgeIncluded
BathroomToiletTypePortable
PositionExternal
Camp & recoveryBullbarBullbar with LED lights.
Recovery boardsMaxtrax.
  • Safari snorkel
  • Winch
  • Spare tire × 2
  • Reversing camera
  • Cookware
  • Tableware
  • Chairs
  • Table
  • Compressor

Permissions

Where you can drive

Off-road places not listed here are off limits unless we arrange permission before your trip. Places that close every year show their usual open dates; the dates move with the weather.

PlaceYesWith approvalOpenClose
Bloomfield TrackWith approval
Cape York PeninsulaOpen 1 May–30 NovWith approval1 May30 Nov
Chambers PillarWith approval
Dalhousie SpringsWith approval
Dirk Hartog IslandYes
Finke RoadWith approval
Francois Peron National ParkYes
Gibb River RoadOpen 1 May–30 NovYes1 May30 Nov
Gunbarrel HighwayWith approval
Jim Jim RoadOpen 1 Jun–31 OctYes1 Jun31 Oct
Kalumburu RoadGibb River Road to the Mitchell Plateau turn-offOpen 1 May–30 NovYes1 May30 Nov
Gibb River Road to the Mitchell Plateau turn-off
Kangaroo IslandYes
Karijini National ParkYes
Mitchell Plateau TrackOpen 15 May–31 OctYes15 May31 Oct
Oodnadatta TrackWith approval
Plenty HighwayWith approval
Purnululu National ParkOpen 1 Apr–30 NovYes1 Apr30 Nov
Savannah WayWith approval
Simpson DesertOpen 16 Mar–30 NovYes16 Mar30 Nov
Steep PointYes
Tanami TrackWith approval
TasmaniaYes
Vulkathunha-Gammon Ranges National ParkYes

Depots

Return to the original pick-up location is required.

Depot
Adelaide
Cairns

Requirements

RequirementDetails
Minimum hire14 days
Driver age25+
The rooftop tent sleeps two. Extra travellers require a separately arranged ground tent.
Towels and tea towels are not supplied.
Ford with electric roof tent
  • Minimum hire 14 days
  • Driver age 25+
Request a quote